BARAKASARAYCreates Comfort
Request a serviceContacts
BackWork package

Designer Premium in Yangihayot

by Service Sphere

BARAKASARAY carries out Designer Premium in Yangihayot after a site visit: we see which complex solutions and author supervision this apartment actually needs. Package rate × area is a labour guide. The final figure follows measurement and the estimate; materials are not included.

Price from2.3 MUZS/m²
Calculate
Designer Premium
Work packageDesigner Premium in Yangihayot
BARAKASARAY05
by Service SphereCREATES COMFORT
Scroll down
Work package

Designer Premium

by Service Sphere

Designer Premium is a bespoke interior, complex solutions, and author supervision. It is the major cycle and a design concept where complex junctions and author accompaniment are part of the package logic, not a “if we get to discuss it” extra.

The expected outline: full major cycle, concept, complex ceilings and tiling, concealed doors and built-ins, author supervision. Exact junctions are confirmed on site: exclusive finishes and non-standard architecture are conditions that only show at inspection.

Labour starts from UZS 2,300,000 per m². A guide, not a final estimate. Materials, delivery, lifting, haulage of a large volume of debris, hire of special equipment, and items outside the estimate are not included. Minimum order starts from UZS 350,000.

In-house crews, daily photo reports, warranty by contract. The schedule is locked after the schedule of works. We do not publish a number of days in advance: complex solutions and author supervision require on-site approvals.

If you do not need author supervision and a bespoke outline, take the designer package (supervision by agreement) or major / Major Premium without a concept.

Yangihayot

Yangihayot

Yangihayot is a newer southern district, created in 2020. There is more new and later housing here, but we still inspect each apartment on site. Labour is priced after measurement; package rate × area is a guide. We work across Tashkent.

Site preparation

How we prepare Designer Premium in Yangihayot

Before work starts, we agree the visit, access to the apartment, and the real scope. A district name never replaces an on-site inspection.

  1. 01

    Survey and measurement

    We visit the apartment in Yangihayot, check surfaces, utilities, and the actual quantities before confirming the work list.

  2. 02

    Estimate by the apartment

    The package rate is a labour guide. The final estimate follows measurement and an agreed schedule of works.

  3. 03

    Access and schedule

    Before starting, we coordinate the convenient visit time, access to the apartment, delivery conditions, and the work sequence.

Work package

Who this package is for

  • You need a bespoke interior, not a typical major set plus “a little décor”.
  • Complex ceilings, complex tiling, concealed doors, and built-ins are part of the brief, not a later option.
  • Author supervision is required as part of the package, documented in the contract after the estimate.
  • You are ready for a survey and staged approval of junctions: Premium composition is not approved without inspection.
Work package

When to choose another package

  • A cosmetic refresh is enough while utilities remain sound.
  • You need the major cycle without a design concept — major or Major Premium.
  • You need a concept, but author supervision only by separate agreement — the base designer package.
  • There is no access for survey and approval of complex solutions.
What is included

What the labour composition covers

The card lists the full major cycle, design concept, complex ceilings and tiling, concealed doors and built-ins, and author supervision. Products, materials, and items outside the approved estimate are separate. Junctions are clarified after inspection.

  1. 01

    Full major renovation cycle

  2. 02

    Design concept

  3. 03

    Complex ceilings and tiling

  4. 04

    Hidden doors and built-ins

  5. 05

    Author supervision

Not included in the labour price

Not included in the labour price

The package sum is labour only: craftsmen, standard professional tools, and work to specification. Construction and finishing materials, delivery, lifting, and haulage of a large volume of debris are not included.

  • Outside the rate

    Construction and finishing materials

  • Outside the rate

    Delivery of materials

  • Outside the rate

    Lifting of materials

  • Outside the rate

    Haulage of a large volume of debris

  • Outside the rate

    Hire of special equipment

  • Outside the rate

    Works not listed in the approved estimate

How the price is formed

How the price is formed

Labour for this package starts from UZS 2,300,000 / m². The figure on the site is a guide: package rate × area is not a final estimate.

The package sum is labour only: craftsmen, standard professional tools, and work to specification. Construction and finishing materials, delivery, lifting, and haulage of a large volume of debris are not included.

The minimum crew call-out or order value starts from UZS 350,000. For a small scope we price not only by area, but by the actual composition and complexity of the works.

The final cost is set after the survey, the schedule of works, the materials calculation, and approval of the estimate. Base rates assume standard conditions; difficult access, height, work in an occupied apartment, and irregular geometry are assessed on site.

How the work proceeds

How the work proceeds

During the works the workplace is cleaned after each stage. In-house crews stay on the job; you see progress in daily photo reports.

  1. 01

    Request

    Submit a request on the website or contact us in a convenient way: a short description of the apartment, the package you have in mind, and a suitable time for the visit.

  2. 02

    Survey

    A specialist visits the property, inspects the rooms, and records quantities, the condition of finishes and utilities, access, and your requirements. We do not approve an estimate without an on-site survey.

  3. 03

    Estimate

    We prepare the schedule of works. Materials are priced separately and purchased by you or by us under an agreed estimate. Package rate × area remains a guide at this stage.

  4. 04

    Contract

    We document the scope, labour cost, schedule, and warranty obligations. Extra work is carried out only after separate approval.

  5. 05

    Works

    BARAKASARAY in-house crews carry out the works. You receive daily photo reports; decisions that change the result or the estimate are agreed in advance.

  6. 06

    Handover

    We inspect the result together, close comments, and sign the completion certificate. Warranty on completed works is set out in the contract.

After handover

After handover

Warranty on completed works is set out in the contract. It does not cover natural wear, mechanical damage, damage from incorrect use, consequences of leaks and utility failures, or defects caused by materials supplied by the client.

During the works the workplace is cleaned after each stage. In-house crews stay on the job; you see progress in daily photo reports.

Materials remain a separate budget: you purchase them yourself or we purchase them under an agreed estimate. Extra items appear in the estimate only after approval.

Questions and answers

Designer Premium in Yangihayot

Short answers before you request a survey.

01Do you visit Yangihayot?

Yes. We survey apartments in Yangihayot and every other Tashkent district before confirming the scope.

02Can the final Designer Premium price be approved without a survey?

No. The rate on the page is a labour guide; the final figure follows measurement, the work list, and access conditions.

03What should be prepared before the visit?

Please arrange access to the apartment and share any drawings, photos, or known issues. We clarify the remaining details on site.

Tashkent districts

Designer Premium across Tashkent districts

We tie the bespoke outline to the apartment in a specific tuman: access, layout, and geometry show only on the visit. The office is in Yakkasaray, 53B Rustaveli. Package × area is a guide until the estimate.