Service
Quick household and technical work
- Handyman services
- Electrical work
- Plumbing
- Minor repairs
- Installation work
- Furniture assembly
- Equipment installation
Apartment and house renovation, commercial property maintenance, and construction.
One contractor for every task at your property.



Choose a direction and our specialist will clarify the task and suggest the next clear step.
Quick household and technical work
Individual work or a complete renovation
From concept to a completed property
BARAKASARAY brings specialists from different disciplines together in one company. Today you may need a socket installed, tomorrow an apartment renovated, and next year a commercial property built. You work with one company and receive unified quality control.
Request a serviceWe clarify the task first, then agree on the solution, cost, and schedule without unnecessary complexity.
Submit a request on the website or call us in any convenient way.
A specialist clarifies the task and visits the property when needed.
We determine the scope, materials, schedule, and cost.
We assign specialists and start the agreed work.
We monitor quality and hand over the completed work.
Clear terms, quality control, and ongoing communication throughout the renovation.
Completed works are covered by contract. Wear, mechanical damage and client-supplied materials are excluded.
After survey and estimate approval, labour cost is fixed. Package price per m² before survey is only a guide.
Works are done by our own craftsmen, without random subcontractors on site.
During renovation the client sees what was completed each day.
Works follow technology. The workplace is cleaned after each stage.
Deadlines are fixed in the contract after the estimate and scope of works.
Package price per m² is a guide. Final cost is fixed after a survey and a detailed estimate. Materials are priced separately.
01BARAKASARAYFinish refresh without major intervention in utilities. For apartments with sound networks and normal wall geometry.
02BARAKASARAYFull scope of rough, engineering and finishing works.
03BARAKASARAYMajor renovation with an extended set of finishing and engineering works.
04BARAKASARAYMajor renovation plus implementation of a design concept.
05BARAKASARAYBespoke interior, complex solutions and author supervision.
Open a category to see current works, units, and rates.
Prices are for labour. Materials are calculated separately. Price list is current for Tashkent, 2026. Preliminary price per m² is not a final estimate.
| Work | Unit | Price |
|---|---|---|
| Wallpaper removal | m² | 35,000 UZS |
| Old paint removal | m² | 20,000 UZS |
| Tile demolition | m² | 50,000 UZS |
| Laminate flooring removal | m² | 20,000 UZS |
| Linoleum removal | m² | 15,000 UZS |
| Screed demolition | m² | from 75,000 UZS |
| Plaster demolition | m² | from 35,000 UZS |
| Drywall demolition | m² | 40,000 UZS |
| Ceiling demolition | m² | from 45,000 UZS |
| Interior door removal | pcs | 50,000 UZS |
| Plumbing fixtures removal | pcs | from 50,000 UZS |
| Radiator removal | pcs | from 70,000 UZS |
| Socket/switch removal | pcs | 10,000 UZS |
| Brick partition demolition | m² | from 100,000 UZS |
| Block partition demolition | m² | from 100,000 UZS |
| Construction debris removal (manual haul) | m³ | from 220,000 UZS |
| Construction debris loading | m³ | from 150,000 UZS |
| Work | Unit | Price |
|---|---|---|
| Wall priming | m² | 5,000 UZS |
| Wall plastering on guides | m² | 60,000 UZS |
| Complex wall plastering | m² | from 95,000 UZS |
| Wall putty for wallpaper | m² | 40,000 UZS |
| Wall putty for painting | m² | 80,000 UZS |
| Wall sanding | m² | 15,000 UZS |
| Wall reinforcement with mesh | m² | 25,000 UZS |
| Painter's mesh installation | m² | 20,000 UZS |
| Drywall partition (1 layer) | m² | 100,000 UZS |
| Drywall partition (2 layers) | m² | 200,000 UZS |
| Wall cladding with drywall | m² | from 120,000 UZS |
| Drywall box/duct enclosure | lin. m | from 100,000 UZS |
| Drywall niche | lin. m | from 150,000 UZS |
| Drywall arch | pcs | from 300,000 UZS |
| Concealed access hatch | pcs | from 150,000 UZS |
| Wall painting, 2 coats | m² | 50,000 UZS |
| Painting in 3 coats | m² | 70,000 UZS |
| Decorative paint application | m² | from 80,000 UZS |
| Decorative plaster application | m² | from 70,000 UZS |
| Standard wallpaper hanging | m² | 55,000 UZS |
| Vinyl/non-woven wallpaper hanging | m² | 60,000 UZS |
| Premium designer wallpaper hanging | m² | from 90,000 UZS |
| Photo mural wallpaper hanging | m² | from 80,000 UZS |
| Textile wallpaper hanging | m² | from 90,000 UZS |
| Wallpaper hanging with pattern matching | m² | from 75,000 UZS |
| Wall preparation for wallpaper | m² | from 55,000 UZS |
| Wall tile installation | m² | 120,000 UZS |
| Decorative tile installation | m² | from 170,000 UZS |
| Decorative panel installation | m² | from 100,000 UZS |
| Wall slat installation | m² | from 120,000 UZS |
| Molding installation | lin. m | from 35,000 UZS |
| Work | Unit | Price |
|---|---|---|
| Ceiling priming | m² | 6,000 UZS |
| Ceiling plastering | m² | from 95,000 UZS |
| Ceiling puttying | m² | 75,000 UZS |
| Ceiling sanding | m² | 20,000 UZS |
| Ceiling reinforcement | m² | 30,000 UZS |
| Simple drywall ceiling | m² | from 140,000 UZS |
| Complex drywall ceiling | m² | from 220,000 UZS |
| Ceiling painting, 2 coats | m² | 55,000 UZS |
| Drywall ceiling installation | m² | from 140,000 UZS |
| Single-level stretch ceiling installation | m² | from 70,000 UZS |
| Multi-level ceiling installation | m² | from 150,000 UZS |
| Shadow-line profile installation | lin. m | from 45,000 UZS |
| Cornice installation | lin. m | from 50,000 UZS |
| Ceiling cove molding installation | lin. m | 35,000 UZS |
| Concealed curtain track installation | lin. m | from 100,000 UZS |
| Work | Unit | Price |
|---|---|---|
| Floor screed up to 5 cm | m² | 50,000 UZS |
| Floor screed over 5 cm | m² | from 80,000 UZS |
| Self-leveling floor | m² | from 25,000 UZS |
| Floor waterproofing | m² | 35,000 UZS |
| Complete bathroom waterproofing | m² | from 45,000 UZS |
| Floor insulation | m² | from 35,000 UZS |
| Laminate flooring installation | m² | 70,000 UZS |
| SPC flooring installation | m² | 75,000 UZS |
| Engineered hardwood installation | m² | from 90,000 UZS |
| Linoleum installation | m² | 35,000 UZS |
| Carpet installation | m² | 45,000 UZS |
| Luxury vinyl tile (LVT) installation | m² | from 75,000 UZS |
| Floor tile installation | m² | 120,000 UZS |
| Tile laying on floor | m² | 110,000 UZS |
| Complex tile layout | m² | from 180,000 UZS |
| Large-format tile installation | m² | from 220,000 UZS |
| Porcelain stoneware installation | m² | from 180,000 UZS |
| Mosaic installation | m² | from 220,000 UZS |
| Grout application | m² | 20,000 UZS |
| Epoxy grout application | m² | from 45,000 UZS |
| 45° tile miter cut | lin. m | 60,000 UZS |
| Hole cutting in tile | pcs | from 30,000 UZS |
| Tile border installation | lin. m | 50,000 UZS |
| Shower tray formation | pcs | from 600,000 UZS |
| Stair tile installation | lin. m | from 120,000 UZS |
| PVC skirting installation | lin. m | 25,000 UZS |
| MDF skirting installation | lin. m | 65,000 UZS |
| Wooden skirting installation | lin. m | from 80,000 UZS |
| Threshold strip installation | pcs | from 50,000 UZS |
| Work | Unit | Price |
|---|---|---|
| Wall chasing (cable/pipe chase) | lin. m | 25,000 UZS |
| Concrete chasing | lin. m | from 35,000 UZS |
| Cable laying | lin. m | 7,000 UZS |
| Flush mount box installation | pcs | 15,000 UZS |
| Socket installation | pcs | 35,000 UZS |
| Switch installation | pcs | 35,000 UZS |
| Turnkey electrical point | pcs | 100,000 UZS |
| Lighting point | pcs | 70,000 UZS |
| Chandelier installation | pcs | from 100,000 – 500,000 UZS |
| Recessed spotlight installation | pcs | 40,000 UZS |
| LED strip lighting installation | lin. m | from 35,000 UZS |
| Electrical panel installation | pcs | from 500,000 UZS |
| Electrical panel assembly | pcs | from 700,000 UZS |
| Circuit breaker installation | pcs | 50,000 UZS |
| RCD/RCBO installation | pcs | 70,000 UZS |
| Ethernet cable laying | lin. m | 10,000 UZS |
| Ethernet jack installation | pcs | 40,000 UZS |
| TV outlet installation | pcs | 40,000 UZS |
| Work | Unit | Price |
|---|---|---|
| Water supply pipe routing | point | from 110,000 UZS |
| Drainage pipe routing | point | from 110,000 UZS |
| Chasing for pipes | lin. m | from 35,000 UZS |
| Water outlet point installation | pcs | 110,000 UZS |
| Faucet installation | pcs | from 100,000 UZS |
| Toilet installation | pcs | from 150,000 UZS |
| Wall-hung toilet frame installation | pcs | from 250,000 UZS |
| Sink installation | pcs | from 150,000 UZS |
| Bathtub installation | pcs | from 250,000 UZS |
| Shower system installation | pcs | from 200,000 UZS |
| Shower tray installation | pcs | from 200,000 UZS |
| Trap/siphon installation | pcs | 50,000 UZS |
| Water heater installation | pcs | from 200,000 UZS |
| Washing machine installation | pcs | from 100,000 UZS |
| Dishwasher installation | pcs | from 120,000 UZS |
| Towel warmer installation | pcs | from 150,000 UZS |
| Water filter installation | set | from 150,000 UZS |
| Work | Unit | Price |
|---|---|---|
| Chasing for AC line set | lin. m | from 35,000 UZS |
| AC line set installation | lin. m | from 50,000 UZS |
| Indoor AC unit installation | pcs | from 200,000 UZS |
| Outdoor AC unit installation | pcs | from 250,000 UZS |
| Ventilation duct installation | lin. m | from 50,000 UZS |
| Exhaust fan installation | pcs | from 100,000 UZS |
| Range hood installation | pcs | from 150,000 UZS |
| Wall insulation | m² | from 70,000 UZS |
| Wall soundproofing | m² | from 120,000 UZS |
| Ceiling soundproofing | m² | from 150,000 UZS |
| Floor soundproofing | m² | from 100,000 UZS |
| Mineral wool installation | m² | from 45,000 UZS |
| Thermal insulation installation | m² | from 50,000 UZS |
| Radiator painting | pcs | from 100,000 UZS |
| Pipe painting | lin. m | from 15,000 UZS |
One contractor for the repair, service, and construction needs of your business.
Discuss maintenanceThese cards demonstrate feedback about transparent estimates, communication, and workmanship.
Everything included in the price was explained before work began. The estimate was clear, and we received regular progress photos.
We liked that every stage was agreed in advance. Questions were answered quickly, and changes were discussed before implementation.
The team paid close attention to the design details and complex junctions. The completed interior feels precise and cohesive.
The work progressed consistently and the site was kept tidy. Photo updates were especially useful while we were away.
The schedule and scope were documented in the contract. At handover we inspected every room and minor comments were resolved.
We valued the clear communication: we always knew what was complete, what came next, and which decisions needed approval.
Answers to the main questions clients ask before the property survey and renovation.
Calculate the costThe package rate is a guide to labour cost. The exact scope is confirmed after the survey and detailed estimate.
No. Construction and finishing materials are priced separately and purchased by the client or by the company under an agreed estimate.
No. The calculator provides a preliminary guide. Final cost depends on the condition, scope, and complexity of the property.
The agreed estimate and scope are documented in the contract. Additional work is carried out only after separate approval.
Yes. Warranty obligations and conditions are documented in the contract after the scope is agreed.
The team sends regular photo reports and asks for approval on decisions that affect the result or estimate.
Area, current condition, selected package, and design complexity. A realistic schedule is set after the survey.
Yes. The minimum crew call-out or order value starts from UZS 350,000.
Choose a direction, briefly describe the task, and we will suggest a solution and contact you.
We will answer your questions, estimate the cost and arrange a survey.