Major renovation in Yakkasaray

by Service Sphere

BARAKASARAY carries out Major renovation in Yakkasaray after a site visit: we review demolition, substrates, utilities, and the finish outline. Package rate × area is a labour guide. The final figure follows measurement and the schedule of works; materials are not in the guide.

Price from1 MUZS/m²
Calculate
Major renovation
Work packageMajor renovation in Yakkasaray
BARAKASARAY02
by Service SphereCREATES COMFORT
Scroll down
Work package

Major renovation

by Service Sphere

BARAKASARAY major renovation is a full cycle of rough, engineering, and finishing works. It is for an apartment that needs to be rebuilt: not only fresh paint, but strip-out, substrates, utilities, and finish in one schedule of works.

The composition includes demolition, rough works, wall and floor leveling, electrical installation, plumbing, tiling, ceilings, fine finishing, floor coverings, and installation of doors and sanitary ware. That is labour. Materials, fixtures, doors, and tile are priced separately.

The rate starts from UZS 1,000,000 per m². It is a labour guide: rate × area does not replace the estimate after survey. The minimum order starts from UZS 350,000. For a small scope we price the actual composition, not only floor area.

In-house crews carry out the works. Daily photo reports show what has been closed on site. The schedule appears in the contract after the schedule of works — we do not publish a number of days in advance: it depends on area, wear, and junctions.

If utilities and geometry are sound and you only need finishes, the cosmetic package is enough. If you need an authored interior, complex lighting, and decorative finishes, look at designer renovation. Major Premium is the same cycle with an upgraded finish and engineering set.

Yakkasaray

Yakkasaray

Yakkasaray is a central district with mixed housing: buildings of different periods, typical series blocks and later stock. BARAKASARAY’s office is here at 53B Shota Rustaveli Street. We survey the apartment on site and price labour after measurement. We work across all Tashkent districts, not only Yakkasaray.

Site preparation

How we prepare Major renovation in Yakkasaray

Before work starts, we agree the visit, access to the apartment, and the real scope. A district name never replaces an on-site inspection.

  1. 01

    Survey and measurement

    We visit the apartment in Yakkasaray, check surfaces, utilities, and the actual quantities before confirming the work list.

  2. 02

    Estimate by the apartment

    The package rate is a labour guide. The final estimate follows measurement and an agreed schedule of works.

  3. 03

    Access and schedule

    Before starting, we coordinate the convenient visit time, access to the apartment, delivery conditions, and the work sequence.

Work package

Who this package is for

  • An apartment for a full redo: demolition, substrates, electrical, plumbing, wet zones, ceilings, and finishing.
  • Resale stock where current finishes and utilities are not enough — new distribution and leveling of planes are required.
  • A turnkey labour outline without a design concept as a separate discipline.
  • You need an estimate after measurement, labour cost documented in the contract, and a warranty on completed works.
Work package

When to choose another package

  • You only need to refresh walls and floors while utilities remain sound — that is the cosmetic package.
  • The core of the job is a design concept, complex lighting scenes, concealed doors, and decorative finishes — the designer package.
  • You need an extended finish and engineering set beyond base major renovation — Major Premium.
  • A surveyor cannot be received: we do not approve a major composition without inspection.
What is included

What the labour composition covers

The package card lists the major composition: demolition, rough works, wall and floor leveling, electrical, plumbing, tiling, ceilings, finishing, floors, doors, and sanitary ware. Installing fixtures and doors is labour; the products and consumables are a separate estimate.

  1. 01

    Demolition

  2. 02

    Rough works

  3. 03

    Wall and floor leveling

  4. 04

    Electrical installation

  5. 05

    Plumbing works

  6. 06

    Tiling

  7. 07

    Ceilings

  8. 08

    Fine finishing

  9. 09

    Floor coverings

  10. 10

    Door and sanitaryware installation

Not included in the labour price

Not included in the labour price

The package sum is labour only: craftsmen, standard professional tools, and work to specification. Construction and finishing materials, delivery, lifting, and haulage of a large volume of debris are not included.

  • Outside the rate

    Construction and finishing materials

  • Outside the rate

    Delivery of materials

  • Outside the rate

    Lifting of materials

  • Outside the rate

    Haulage of a large volume of debris

  • Outside the rate

    Hire of special equipment

  • Outside the rate

    Works not listed in the approved estimate

  • Outside the rate

    Design work, unless it is included in the package

How the price is formed

How the price is formed

Labour for this package starts from UZS 1,000,000 / m². The figure on the site is a guide: package rate × area is not a final estimate.

The package sum is labour only: craftsmen, standard professional tools, and work to specification. Construction and finishing materials, delivery, lifting, and haulage of a large volume of debris are not included.

The minimum crew call-out or order value starts from UZS 350,000. For a small scope we price not only by area, but by the actual composition and complexity of the works.

The final cost is set after the survey, the schedule of works, the materials calculation, and approval of the estimate. Base rates assume standard conditions; difficult access, height, work in an occupied apartment, and irregular geometry are assessed on site.

How the work proceeds

How the work proceeds

During the works the workplace is cleaned after each stage. In-house crews stay on the job; you see progress in daily photo reports.

  1. 01

    Request

    Submit a request on the website or contact us in a convenient way: a short description of the apartment, the package you have in mind, and a suitable time for the visit.

  2. 02

    Survey

    A specialist visits the property, inspects the rooms, and records quantities, the condition of finishes and utilities, access, and your requirements. We do not approve an estimate without an on-site survey.

  3. 03

    Estimate

    We prepare the schedule of works. Materials are priced separately and purchased by you or by us under an agreed estimate. Package rate × area remains a guide at this stage.

  4. 04

    Contract

    We document the scope, labour cost, schedule, and warranty obligations. Extra work is carried out only after separate approval.

  5. 05

    Works

    BARAKASARAY in-house crews carry out the works. You receive daily photo reports; decisions that change the result or the estimate are agreed in advance.

  6. 06

    Handover

    We inspect the result together, close comments, and sign the completion certificate. Warranty on completed works is set out in the contract.

After handover

After handover

Warranty on completed works is set out in the contract. It does not cover natural wear, mechanical damage, damage from incorrect use, consequences of leaks and utility failures, or defects caused by materials supplied by the client.

During the works the workplace is cleaned after each stage. In-house crews stay on the job; you see progress in daily photo reports.

Materials remain a separate budget: you purchase them yourself or we purchase them under an agreed estimate. Extra items appear in the estimate only after approval.

Questions and answers

Major renovation in Yakkasaray

Short answers before you request a survey.

01Do you visit Yakkasaray?

Yes. We survey apartments in Yakkasaray and every other Tashkent district before confirming the scope.

02Can the final Major renovation price be approved without a survey?

No. The rate on the page is a labour guide; the final figure follows measurement, the work list, and access conditions.

03What should be prepared before the visit?

Please arrange access to the apartment and share any drawings, photos, or known issues. We clarify the remaining details on site.

Tashkent districts

Major renovation across Tashkent districts

We run the major cycle after inspecting the apartment in any tuman. The office is in Yakkasaray, 53B Rustaveli. On the visit we record demolition, substrates, and engineering; the package rate stays a guide until the estimate.