BARAKASARAYCreates Comfort
Request a serviceContacts
BackWork package

Major Premium in Mirabad

by Service Sphere

BARAKASARAY carries out Major Premium in Mirabad after inspection: we check whether an upgraded finishing and engineering outline is required. Package rate × area is a labour guide. The final estimate follows measurement; materials are not in the guide.

Price from1.5 MUZS/m²
Calculate
Major Premium
Work packageMajor Premium in Mirabad
BARAKASARAY03
by Service SphereCREATES COMFORT
Scroll down
Work package

Major Premium

by Service Sphere

Major Premium is the major cycle with an upgraded set of finishing and engineering. The base is the same: demolition, rough works, leveling, electrical, plumbing, tiling, ceilings, finishing, floors, doors, and sanitary ware. The difference is a more demanding finish and engineering outline, which we lock in the estimate after survey.

The package makes sense when the base major composition is not enough: more complex finishing junctions, extended engineering, a different level of finish coverings. We do not invent the list in advance — the apartment inspection supplies it.

Labour starts from UZS 1,500,000 per m². That is a guide. Materials, delivery, lifting, and haulage of a large volume of debris are not included. The final figure follows the schedule of works and approval of the estimate. Minimum order starts from UZS 350,000.

In-house crews and daily photo reports are on the job. Warranty on works is by contract. Dates appear in the contract after the scope — we do not preset a number of days.

If a standard major outline is enough, take the major package. If the core of the job is a design concept and authored solutions, choose designer or Designer Premium.

Mirabad

Mirabad

Mirabad is a central district with mixed fabric: residential buildings of different ages inside the city core. Access to the apartment and the actual condition of finishes matter more than a “central” label. We survey on site and price labour after measurement. We take apartments across the city.

Site preparation

How we prepare Major Premium in Mirabad

Before work starts, we agree the visit, access to the apartment, and the real scope. A district name never replaces an on-site inspection.

  1. 01

    Survey and measurement

    We visit the apartment in Mirabad, check surfaces, utilities, and the actual quantities before confirming the work list.

  2. 02

    Estimate by the apartment

    The package rate is a labour guide. The final estimate follows measurement and an agreed schedule of works.

  3. 03

    Access and schedule

    Before starting, we coordinate the convenient visit time, access to the apartment, delivery conditions, and the work sequence.

Work package

Who this package is for

  • You need the full major cycle, but with upgraded finishing and engineering relative to the base package.
  • An apartment where finish coverings and engineering solutions are more demanding than a typical major set.
  • The extended composition must be locked in the estimate after survey, not guessed from the website rate.
  • You want in-house crews, photo reports, and contract warranty — without random subcontractors on site.
Work package

When to choose another package

  • Cosmetic work is enough: sound utilities and normal geometry.
  • The base major composition is enough, without extended finishing and engineering.
  • The package core is a design concept, complex lighting, concealed doors, and decorative finishes — designer renovation.
  • There is no site visit: we do not approve an extended composition without measurement.
What is included

What the labour composition covers

The card lists the major outline with upgraded finishing and engineering: demolition and rough works, wall and floor leveling, electrical and plumbing, tiling, ceilings, finishing, doors, and sanitary fixtures. Exact Premium junctions are confirmed after inspection. Products and materials are separate.

  1. 01

    Demolition and rough works

  2. 02

    Wall and floor leveling

  3. 03

    Electrical and plumbing

  4. 04

    Tiles, ceilings, finishing

  5. 05

    Doors and sanitary fixtures

Not included in the labour price

Not included in the labour price

The package sum is labour only: craftsmen, standard professional tools, and work to specification. Construction and finishing materials, delivery, lifting, and haulage of a large volume of debris are not included.

  • Outside the rate

    Construction and finishing materials

  • Outside the rate

    Delivery of materials

  • Outside the rate

    Lifting of materials

  • Outside the rate

    Haulage of a large volume of debris

  • Outside the rate

    Hire of special equipment

  • Outside the rate

    Works not listed in the approved estimate

  • Outside the rate

    Design work, unless it is included in the package

How the price is formed

How the price is formed

Labour for this package starts from UZS 1,500,000 / m². The figure on the site is a guide: package rate × area is not a final estimate.

The package sum is labour only: craftsmen, standard professional tools, and work to specification. Construction and finishing materials, delivery, lifting, and haulage of a large volume of debris are not included.

The minimum crew call-out or order value starts from UZS 350,000. For a small scope we price not only by area, but by the actual composition and complexity of the works.

The final cost is set after the survey, the schedule of works, the materials calculation, and approval of the estimate. Base rates assume standard conditions; difficult access, height, work in an occupied apartment, and irregular geometry are assessed on site.

How the work proceeds

How the work proceeds

During the works the workplace is cleaned after each stage. In-house crews stay on the job; you see progress in daily photo reports.

  1. 01

    Request

    Submit a request on the website or contact us in a convenient way: a short description of the apartment, the package you have in mind, and a suitable time for the visit.

  2. 02

    Survey

    A specialist visits the property, inspects the rooms, and records quantities, the condition of finishes and utilities, access, and your requirements. We do not approve an estimate without an on-site survey.

  3. 03

    Estimate

    We prepare the schedule of works. Materials are priced separately and purchased by you or by us under an agreed estimate. Package rate × area remains a guide at this stage.

  4. 04

    Contract

    We document the scope, labour cost, schedule, and warranty obligations. Extra work is carried out only after separate approval.

  5. 05

    Works

    BARAKASARAY in-house crews carry out the works. You receive daily photo reports; decisions that change the result or the estimate are agreed in advance.

  6. 06

    Handover

    We inspect the result together, close comments, and sign the completion certificate. Warranty on completed works is set out in the contract.

After handover

After handover

Warranty on completed works is set out in the contract. It does not cover natural wear, mechanical damage, damage from incorrect use, consequences of leaks and utility failures, or defects caused by materials supplied by the client.

During the works the workplace is cleaned after each stage. In-house crews stay on the job; you see progress in daily photo reports.

Materials remain a separate budget: you purchase them yourself or we purchase them under an agreed estimate. Extra items appear in the estimate only after approval.

Questions and answers

Major Premium in Mirabad

Short answers before you request a survey.

01Do you visit Mirabad?

Yes. We survey apartments in Mirabad and every other Tashkent district before confirming the scope.

02Can the final Major Premium price be approved without a survey?

No. The rate on the page is a labour guide; the final figure follows measurement, the work list, and access conditions.

03What should be prepared before the visit?

Please arrange access to the apartment and share any drawings, photos, or known issues. We clarify the remaining details on site.

Tashkent districts

Major Premium across Tashkent districts

We confirm the extended major composition in the apartment — in any of the twelve districts. The office is in Yakkasaray, 53B Rustaveli. Package × area stays a guide until the estimate after measurement.